Saturday, February 23, 2019
Boston Red Sox Spring Training Stadium Essay
 ikon 1 the center of gravity modelAccording to the requirement from metropolis Council Members, the  packed of important places (included the Population Center) had ranked in the table above. The highest weight mean the important of that location. Therefore, according to the center gravity model, the  high hat  egress of the training stadium site is the red dot in the  rule 1.2)  ladinged Scoring  lessonTable 2 Calculation of Weight Scoring  mannequin (Considering the Cost) According to table, the  outdo stadium site from  all told the candidate would be Site C, because the weighted score of Site C is the highest among all Sites. However, the weight ranked by the important of the issues in the future. On the other hand, the Site C does not include the Cost of the Land, because it is a wet come to and preserve area, so that it is not fair to other sites, which they have the land cost. Therefore, I come up with the new Table that not  claim the cost of the land.Table 3 Calculation of    Weight Scoring Model (without Considering the Land Cost) Therefore, it turn out to be that the Site D has the best score among all the sites. PS The minus sign means the  lever is negative because it is a cost.3) Combine the result from Center of Gravity Model and Weight Scoring Model Accord to the answers from Figure1 and Table3, the best result would be the  bowlful Site A because it in between the Best  elevation and the weight scoring is nearly the same as site-D4) Final  tri saveeAccording to these analysis and modeling, the best site would be the Site Afor two reasons. First, Site A is closed to two major shop Malls, which this could provide the jobs in the area and  grant more revenue in the area. Second, it is very close to the Interstate 75 (I-75) which means it is very  light(a) to access the stadium from the Airport and the stadium would be the new  corner for the  urban center, because the stadium would huge enough for seeing from the I-75.However, the cost of the utilit   y is highest among those sites, but for the long-run with revenue that generate from the long lease with Red Sox team, it is a guarantee that the revenue will cover all the cost and generate a really nice profit for the city. Therefore, Site A is the best suite for the new Boston Red Sox Spring Training Stadium that generate the better economic in the local businesses in the  obtain malls and area around there and also created the new landmark for the city that is very easy to access from the interstate 75.  
Subscribe to:
Post Comments (Atom)
 
 
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.